Cost planning

Plan materials, labour, and machinery together

Construction cost planning combines measured quantities with rates for materials, labour, equipment, preliminaries, risk, and taxes. Quotify helps project teams bring those inputs into one structured view while preserving the assumptions behind each rate.

Geographic scope: Early estimates, tender pricing, and project cost review in Zambia

Four cost groups to review

Cost groupTypical basisCommon risk
MaterialsSupplier offer and quantitySpecification or price movement
LabourRole, productivity, and timeProductivity assumption
MachineryHire period and operating basisIdle time and mobilisation
PreliminariesProject duration and site requirementsScope assumptions

State assumptions before adding contingency

Contingency should respond to identified uncertainty, not hide missing scope. Record what is included, what is excluded, the pricing date, the project location, and the level of design information used.

Review as the design develops

An early cost plan is a decision tool, not a fixed promise. Update quantities, rates, and risk allowances when drawings, specifications, procurement strategy, or market evidence changes.